View evaporative cooling systems, cooling towers and wet separators

As the operator of a new plant, you are obliged to notify it to the competent authority no later than one month after the first filling with useful water. Existing plants had to be notified by 20 August 2018. In addition, changes to the installation and a plant closure must be notified without delay, at the latest within one month. In the event of a change of operator, the new operator shall notify the competent authority of this change without delay, but at the latest within one month.

The display is made electronically via the "Cadastre for the detection of evaporative cooling systems 42. BImSchV KaVKA" .

Related Links

The display is made via the "Cadastre for the detection of evaporative cooling systems 42. BImSchV KaVKA" . To display an attachment, registration in the KaVKA-42.BV system is required first. After successful registration, the master data of the workplace (the location of the plant) and the plant can be recorded and the notification transmitted to the competent authority. Please refer to the following link for information on registration and registration.

Related Links

Responsible for the content
Ministry of Environment, Energy, Food and Forestry Rhineland-Palatinate

Last update or date of publication
07.12.2020