Commissioning Display Low-frequency system Unfortunately this specification of service has not yet been completely translated.

As an operator of a low-frequency system with a rated voltage of 110 KV or more or a DC system, you are obliged to notify it to the competent authority before commissioning or a significant change. The competent authority shall examine the notification and record the installation in its plant register.

Display with the data that is relevant to the system Map


Die Anzeige bedarf der Schriftform. 


Preconditions
The prerequisite is that: the installation is located on a plot of land in the area of a development plan or within a related built-up district or on a plot of land built with residential buildings outside or crosses such land, the installation or its material modification does not require a permit, planning approval or any other administrative decision that takes into account the interests of immission protection.
The notification must be submitted in writing by post or electronically to the competent authority.