Commissioning display low frequency system Unfortunately this specification of service has not yet been completely translated.

As an operator of a low-frequency system with a nominal voltage of 110 KV or more or a direct current system, you are obliged to notify the competent authority of this before commissioning or a significant change. The competent authority shall examine the notification and record the installation in its plant register.

Display with the data relevant for the system site plan


Die Anzeige bedarf der Schriftform. 


Preconditions
The prerequisite is that the installation is located on a plot of land in the area of a development plan or within a contiilent built-up district or on a plot of land built with residential buildings in the outdoor area or crosses such land, the plant or its substantial modification does not require a permit, planning approval or other official decision that takes into account the interests of immission control.
The notification shall be submitted in writing by post or electronically to the competent authority.

Responsible for the content
Lower Saxony Ministry for the Environment, Energy, Building and Climate Protection

Last update or date of publication
27.01.2021