If you decide to build and operate a heating oil system, a notification to the water authority is required. To be available: the construction of underground installations (regardless of the amount of storage), the construction of above-ground installations with more than 1 000 l of heating oil ("upper ground" is also a storage in the basement of a building) and all material changes and the decommissioning of the plant

Required documents: complete notification form for heating oil systems (a form is available from the lower water authorities or for download on the website of the Hessian Ministry of the Environment, Climate Protection, Agriculture and Consumer Protection)



Hints
The display of the heating oil system must be made in writing.